演示数据 · SYNTHETIC / DEMO ONLY← 预览目录
Match: supply → buyer
Hard constraints gate first (blocked = known mismatch, to verify = unknown or stale). Soft score ranks the rest; it orders work and is not a probability of closing.
Offer SYN-OFF-0001 · Demo Ceramics Studio
- Offer
- 350 mL glazed cup, 1-colour logo; tiers 500 / 1,000; lead time 21 d after sample sign-off
- Delivery scope
- VIC, NSW
- Quote valid until
- 2026-12-11Self-reported
Ranked buyer candidates
2 viable · 2 blocked by a hard constraint · ordered by stage, then coverage, then score
| # | Candidate | Hard constraints | Soft score | Coverage | Evidence | Next step |
|---|---|---|---|---|---|---|
| 1 | Demo Coffee Group12 stores · buyer-confirmed demand (merged with demand-side match) | To verifyRequired documents: Food-contact declaration outstanding | 78 | 100% cov. | Verified+1 | Merged into SYN-OPP-0001 — both discovery directions kept |
| 2 | Buyer BSignal only: historical import record — NOT a confirmed current need | To verifySpecification: Inferred from historical HS 6912 imports | 60 | 40% cov. | Inferred | Call to confirm whether there is a current purchasing need |
| 3 | Buyer DBakery group · email enquiry | BlockedQuantity vs MOQ: 240 pcs < confirmed MOQ 500 | Not scored | — | Self-reported | Route to Demo Local Stock (no MOQ) — see SYN-OPP-0006 |
| 4 | Buyer ECafé chain · Perth | BlockedDestination: Perth (WA) outside offer delivery scope VIC/NSW | Not scored | — | Self-reported | Ask supplier whether WA delivery can be added to the quote |
Why #1: Demo Coffee Group
Score 78 · coverage 100%
DimensionWtScoreValue
Specification3090
Quantity & capacity2080
Lead time & location2070
Landed price & margin2075
Evidence quality1060
Hard constraints
- Specification350 mL, 1-colour logoPass
- Quantity vs MOQ500 ≥ MOQ 500Pass
- DestinationMelbourne (VIC) in delivery scopePass
- Lead time21 d ≤ buyer limit 28 dPass
- Required documentsFood-contact declaration outstandingTo verify
Excluded — explicit reasons
Shown so the decision is auditable; re-match only if the buyer changes the condition in writing.
- Buyer D — Quantity vs MOQ: 240 pcs < confirmed MOQ 500
- Buyer E — Destination: Perth (WA) outside offer delivery scope VIC/NSW